• Post category:Projects
  • Reading time:1 mins read

We undertook the project of fixing the toilets and wash basins. The toilets either had missing seats or were not flushing and as a result, the entire school of 550 students had only three working toilets. The wash basins were either leaking or the taps were not working. After our intervention, the students have respectable and hygienic toilet facilities.